Sponsored · TLDR Hardware · GENERAL

A 1 MW AI DATA CENTER IN A SHIPPING CONTAINER, LIVE IN DAYS

runware.ai

Summary from the TLDR Hardware newsletter

Building a data center takes 3–5 years, and about a third of the power goes to cooling and building systems instead of compute. Runware's Sonic Pods [5]skip all of it. Each pod is a complete AI inference data center in a 20 ft shipping container [6], trucked in and live in days: * Up to 1,200 GPUs and 1 MW of compute, any GPU architecture * Closed-loop liquid cooling on every GPU: 1.5 m³ of water, recirculated, none consumed * Europe is live, US rollout underway Capacity is filling up. Reserve a pod [7] or start on Serverless [8], billed by the second.